1. INVESTMENT OBJECTIVES

THE BASIC INVESTMENT OBJECTIVES DURING THE PERIOD UNDER CONSIDERATION ARE SCHEDULED TO PROVIDE:


  • UPGRADING OF THE EXISTING INFRASTRUCTURE FACILITIES TO BE ABLE TO ACCEPT THE EXPECTED TRAFFIC VOLUME
    UPGRADING OF TRACTIVE FLEET
  • INSTALLATION OF NEW INFORMATION SYSTEMS, ACQUISITION OF SOFTWARE AND STAFF TRAINING
  • RAISING OF THE PRODUCTIVITY OF LABOR THROUGH INVESTMENTS ACCORDING TO A SPECIAL PROGRAMME FOR SOLVING THE SURPLUS LABOR PROBLEM, MEETING THE NEEDS FOR RETRAINING AND POSSIBLE EARLY RETIREMENTS
  • IN ORDER TO PLACE IN OPERATION AS EARLY AS POSSIBLE THE FACILITIES BUILT SO FAR, FURTHER INVESTMENTS ARE REQUIRED IN CONSTRUCTION OF THE BELGRADE RAILWAY JUNCTION BY A SPECIAL PROGRAMME
  • INVESTMENTS INTO MODERNIZATION OF EQUIPMENT OF AN ONLY STATION FOR WASHING AND DISINFECTION OF FREIGHT WAGONS AND IN REPLACEMENT OUTSIDE THE BELGRADE CENTER
2. PRIORITY INVESTMENTS AND FINANCIAL RESOURCES

SPECIFICATION OF TOTAL INVESTMENTS

(000 EUR)


DESCRIPTION

YEAR

2003

2004

2005

2006

2007

TOTAL

1. INFRASTRUCTURE

224,139

275,219

228,7774

172,382

116,070

1.016,584

2. ROLLING STOCK*)

50,346

89,671

152,640

100,065

42,474

435,196

3. INTERMODAL EQUIPMENT

810

500

500

300

100

2,210

4. INFORMATION SYSTEM

2,440

3,740

4,610

2,920

1,130

14,840

    INVESTMENTS IN BASIC ASSETS

277,735

369,130

386,524

275,667

159,774

1.468,830

5. STUDIES AND PROJECTS

450

300

 

 

 

750

6. ENVIRONMENT

2,500

2,000

2,000

1,500

0

8,000

7. HUMAN RESOURCES

4,604

2,496

2,000

0

0

9,100

    TOTAL

285,289

373,926

390,524

277,167

159,774

1.486,680


*) The figure includes the resources for rolling stock maintenance


THE INVESTMENT PLAN REPRESENTS THE PRIORITY NEEDS OF RTE "BEOGRAD" IN THE SCOPE OF INFRASTRUCTURE AND ROLLING STOCK IN ORDER TO QUALIFY THOSE ELEMENTS FOR REALIZATION OF THE EXPECTED VOLUME OF PASSENGER AND FREIGHT TRAFFIC INCLUDING ACCEPTABLE LEVEL OF SERVICE QUALITY. CONSIDERING THE FORMER PERIOD OF BAD MAINTENANCE OF STABILE AND MOBILE MEANS, WE CAN SAY THAT EVEN WITH THOSE, RELATIVELY MODEST REQUIREMENTS, THE DEFINED INVESTMENT PLAN MOSTLY REMAINS UNCOVERED BY INVESTMENT SOURCES. FOR ITS COVERING IT IS NECESSARY TO PROVIDE OWN MEANS AND FAVORABLE LOANS AND CREDITS. FOR NOW, THE ACTUAL LOANS ARE THOSE OBTAINED FROM THE EBRD AND EIB IN THE SCOPE OF THE REALIZATION OF THE PROJECT ENTITLED "REHABILITATION OF THE RAILWAY INFRASTRUCTURE IN SERBIA", WHICH INCLUDES EMERGENCY MEASURES, I.E. QSR PROJECTS.

IZDVAJAMO
AKTUELNO
VESTI
RED VOŽNJE
KOMERCIJALNE POVLASTICE
NAJNOVIJA "PRUGA"
LOKACIJA TERETNIH KOLA
MEDIJA CENTAR
ŠARGANSKA OSMICA
TURISTIČKI VOZ "ROMANTIKA"
PLAVI VOZ
 
© Železnice Srbije 2006 | designed & produced by MASSVision, powered by cMASS